PHOTOS: Excavations Continue

Now that the cemented heads of the piles are dry and the walls are secure on the north side of the lot, heavy equipment has been brought in and the first 3 meters are being excavated (supports go in every 3 meters). Meanwhile, the piles continue to be drilled along the south wall.  Below are pictures from the past few weeks.